Advancing Project Management Methodologies: An In-Depth Analysis of Jira in Managerial and Developmental Contexts
DOI:
https://doi.org/10.54489/ijtim.v3i2.303Keywords:
Jira, Project Management, Usability Test, Agile, Management ToolAbstract
A study was conducted to examine the satisfaction levels of project teams with the Jira mobile application, a leading project management tool, in Saudi Arabian companies. Through usability tests and surveys, the research addresses three key questions related to the satisfaction of project managers and developers with Jira mobile application and improve their experiences. While most project managers found Jira to be an efficient and easy-to-use tool, some suggestions for improvements were made, including the ability to edit, delete, and clone projects as well as a resource management ability. Similarly, developers have reported that Jira has significantly improved task tracking and status monitoring, while also suggesting improved mobile functionality. Usability testing and surveys highlighted specific issues with Jira's mobile application and provided recommendations for enhancement. The study aims to empower project teams with effective management capabilities through Jira.
References
E.D.C. Carvalho, P.R.C. Malcher, and R.P.Dos Santos, “A Survey Research on the Use of Mobile Applications in Software Project Management,” in ACM International Conference Proceeding Series, 2020.
doi:10.1145/3439961.3439963. DOI: https://doi.org/10.1145/3439961.3439963
S.Morrison-Smith and J.Ruiz, “Challenges and barriers in virtual teams:a literature review,” SN Appl Sci, vol.2, no. 6, 2020, doi:10.1007/s42452-020-2801-5. DOI: https://doi.org/10.1007/s42452-020-2801-5
S.Chopra and M. Chaudhary, “Remote Work is the New Normal:Virtual Teams as a Prerequisite in Global Business Strategy,” FOCUS:Journal of International Business, vol. 9, no.1, 2022, doi:10.17492/jpi.focus.v9i1.912205. DOI: https://doi.org/10.17492/jpi.focus.v9i1.912205
P. Marnada, T.Raharjo, B.Hardian, and A.Prasetyo, “Agile project management challenge in handling scope and change:A systematic literature review,” in Procedia Computer Science, 2021.
doi:10.1016/j.procs.2021.12.143. DOI: https://doi.org/10.1016/j.procs.2021.12.143
M.D.Kadenic, K.Koumaditis, and L.Junker-Jensen, “Mastering scrum with a focus on team maturity and key components of scrum,” Inf Softw Technol, vol. 153, 2023, doi:10.1016/j.infsof.2022.107079. DOI: https://doi.org/10.1016/j.infsof.2022.107079
F.Hayat, A.U.Rehman,K.S. Arif, K. Wahab, and M. Abbas, “The Influence of Agile Methodology (Scrum) on Software Project Management,” in Proceedings - 20th IEEE/ACIS International Conference on Software Engineering, Artificial Intelligence, Networking and Parallel/Distributed Computing, SNPD 2019, 2019. doi:10.1109/SNPD.2019.8935813. DOI: https://doi.org/10.1109/SNPD.2019.8935813
R.Pellerin, N.Perrier, X.Guillot, and P.M.Léger, “Project characteristics, project management software utilization and project performance:An impact analysis based on real project data,” International Journal of Information Systems and Project Management, vol.1, no. 3, 2013, doi:10.12821/ijispm010301. DOI: https://doi.org/10.12821/ijispm010301
M.E.Bogopa and C.Marnewick,“Critical success factors in software development projects,”South African Computer Journal, vol. 34, no.1, 2022, doi:10.18489/sacj.v34i1.820. DOI: https://doi.org/10.18489/sacj.v34i1.820
H.Yogaantara and A.N.Fajar, “ANALYSIS OF FACTORS CAUSING INFORMATION SYSTEMS PROJECTS DELAYS IN IT CONSULTING COMPANY,” J Theor Appl
Inf Technol, vol.100, no.23,2022.
H. Rahman, M. N. Shafique, and A. Rashid, “Project Success in the Eyes of Project Management Information System and Project Team Members,” 2018.
M. Hamid, F. Zeshan, A. Ahmad, and E. Aimeur, “Factors contributing in failures of software projects,” International Journal of Computer Science and Network Security, vol.19,no.5,2019.
M. Kuutila, M. Mäntylä, U. Farooq, and M. Claes, “Time pressure in software engineering:A systematic review,” Information and Software Technology, vol. 121. 2020. doi:10.1016/j.infsof.2020.106257. DOI: https://doi.org/10.1016/j.infsof.2020.106257
A.-D. Salaou, D.Damian, C.Lassenius, D.Voda, and P. Gançarski, “Archetypes of delay:An analysis of online developer conversations on delayed work items in IBM Jazz,” Inf Softw Technol, vol. 129, p. 106435, Jan. 2021, doi:10.1016/j.infsof.2020.106435. DOI: https://doi.org/10.1016/j.infsof.2020.106435
A.Behrens, M.Ofori, C.Noteboom, and D.Bishop, “A systematic literature review:how agile is agile project management?,” Issues in Information Systems, vol. 22, no. 3, 2021, doi:10.48009/3_iis_2021_298-316. DOI: https://doi.org/10.48009/3_iis_2021_298-316
J.R.da Costa Filho, R.Penha, L. F. da Silva, and F. S. Bizarrias, “Competencies for Managing Activities in Agile Projects,” Global Journal of Flexible Systems Management, vol. 23, no. 4, 2022, doi:10.1007/s40171-022-00311-2. DOI: https://doi.org/10.1007/s40171-022-00311-2
Y.Chouhan, A.Sangle, A. Patil, S. Ramteke, and K. V Metre, “Project Management Tool:A Review,” ijsdr.org International Journal of Scientific Development and Research, vol. 7, 2022.
M.N.Mahdi et al., “Software project management using machine learning technique-a review,” Applied Sciences (Switzerland), vol. 11, no. 11, 2021, doi:10.3390/app11115183. DOI: https://doi.org/10.3390/app11115183
A.Puška, I.Stojanović, A. Maksimović, and N. Osmanović, “Project management software evaluation by using the measurement of alternatives and ranking according to compromise solution (MARCOS) method,” Operational Research in Engineering Sciences:Theory and Applications, vol. 3, no.1,2020, doi:10.31181/oresta2001089p. DOI: https://doi.org/10.31181/oresta2001089p
M.Mahmud, “Impact analysis of digital transformations on entrepreneurial ecosystem in the eastern province of Saudi Arabia,”J.Entrep Educ, vol.23, no.1, 2020.
M.Talukder, M. Alajmi, and M. Mohammadian, “The Determinants of Smart Government Systems Adoption by Public Sector Organizations in Saudi Arabia,” SSRN Electronic Journal, 2022, doi:10.2139/ssrn.4297900. DOI: https://doi.org/10.2139/ssrn.4297900
A.Faudot, “Saudi Arabia and the rentier regime trap:A critical assessment of the plan Vision 2030,” Resources Policy, vol.62,2019, doi:10.1016/j.resourpol.2019.03.009. DOI: https://doi.org/10.1016/j.resourpol.2019.03.009
E.Ismagilova, L. Hughes, Y. K. Dwivedi, and K. R. Raman, “Smart cities:Advances in research—An information systems perspective,” International Journal of Information Management, vol. 47. 2019.
doi:10.1016/j.ijinfomgt.2019.01.004. DOI: https://doi.org/10.1016/j.ijinfomgt.2019.01.004
D.Özkan and A. Mishra, “Agile Project Management Tools:A Brief Comprative View,” Cybernetics and Information Technologies, vol. 19, no. 4, 2019, doi:10.2478/cait- DOI: https://doi.org/10.2478/cait-2019-0033
-0033.
R.Imran and T. R. Soomro, “Mapping of Agile Processes into Project Management Knowledge Areas and Processes,” in 2022 International Conference on Business Analytics for Technology and Security (ICBATS), IEEE, Feb. 2022, pp. 1–12. doi:10.1109/ICBATS54253.2022.9759013. DOI: https://doi.org/10.1109/ICBATS54253.2022.9759013
D.Ciric Lalic, B. Lalic, M. Delić, D.Gracanin, and D.Stefanovic, “How project management approach impact project success? From traditional to agile,” International Journal of Managing Projects in Business, vol. 15, no.3,2022, doi:10.1108/IJMPB-04-2021-0108. DOI: https://doi.org/10.1108/IJMPB-04-2021-0108
M.Younas, D.N.A.Jawawi, A.K.Mahmood, M.N.Ahmad, M. U. Sarwar, and M. Y. Idris, “Agile Software Development
Using Cloud Computing:A Case Study,” IEEE Access, vol. 8, 2020, doi:10.1109/ACCESS.2019.2962257. DOI: https://doi.org/10.1109/ACCESS.2019.2962257
A.Gupta, G. Poels, and P. Bera, “Using Conceptual Models in Agile Software Development:A Possible Solution to Requirements Engineering Challenges in Agile Projects,” IEEE Access, vol.10, 2022, doi:10.1109/ACCESS.2022.3221428. DOI: https://doi.org/10.1109/ACCESS.2022.3221428
D.Ghimire and S. Charters, “The Impact of Agile Development Practices on Project Outcomes,” Software, vol.1, no.3, 2022, doi:10.3390/software1030012. DOI: https://doi.org/10.3390/software1030012
A.Mishra and Y. I. Alzoubi, “Structured software development versus agile software development:a comparative analysis,” International Journal of System Assurance Engineering and Management, vol. 14, no. 4, 2023, doi:10.1007/s13198-023-01958-5. DOI: https://doi.org/10.1007/s13198-023-01958-5
M.I.Lunesu, R. Tonelli, L. Marchesi, and M. Marchesi, “Assessing the risk of software development in agile methodologies using simulation,” IEEE Access, vol.9, 2021, doi:10.1109/ACCESS.2021.3115941. DOI: https://doi.org/10.1109/ACCESS.2021.3115941